2% Discount on payment through UPI or Direct Bank Transfer You can Contact us on +919326136336
- Apple MacBooks
- Laptops – PreOwned
- Desktops & Tiny PC’s – PreOwned
- Workstations & Servers
- Memory (RAM) For Laptops/Desktops
- SSD & Harddisk Drives (Storage)
- Graphics Card
- Motherboards for HP / DELL / Lenovo
- Motherboard for Desktop – Intel Chipset
- Power Supply (SMPS) for HP/Dell/Lenovo
- Power Adapters for Laptops/ Mini PC
- Processors (CPU)
- LCD-LED Monitors (Display)
- Accessories
High-performance HDMI cable with gold-plated connectors. Superior stability and broad compatibility with various devices. Compact design for easy installation and reliable connectivity.
Compact HDMI cable supporting 4K Ultra HD. Gold-plated connectors for optimal signal transmission. Powerful performance in a small form factor for home theater and gaming setups.
High-speed HDMI 4K cable supporting 7680x4320 resolution. 19+1 wire structure, 3-meter length with gold-plated connectors. Features Audio Return Channel (ARC) and Ethernet support. Tangle-free and heat resistant.
Bluetooth 5.1 adapter with up to 10-meter range. Supports dual audio streaming, advanced chipset for reliable performance. Universal compatibility with computers and audio devices. Small and portable design.
WiFi and Bluetooth 4.2 combo adapter. Dual-band 2.4GHz/5GHz support with speeds up to 433Mbps. Compatible with Windows XP/Vista/7/10/11 and MacOS. Compact design with advanced connectivity features.
USB hub with 1xUSB 3.0 and 3xUSB 2.0 ports. 1.5m cable length for flexible placement. High-speed data transfer suitable for connecting multiple peripherals to computers.
3-in-1 CD/DVD reader with SD card slot, USB port, and Type-C slot. Built-in 2-in-1 cable for easy connectivity. Portable and compact design with plug-and-play operation.
9-in-1 Type-C docking station with HDMI 4K, VGA 1080P, USB 3.0, 2xUSB 2.0, PD charging, RJ45 Ethernet, SD/TF card reader, and 3.5mm audio port. Comprehensive connectivity solution for office and home use.
Type-C hub with 3.5mm audio jack, 2xUSB 2.0 ports, micro SD card slot, and SD/SDHC/MMC card reader. Features short circuit protection and high-speed data transfer in a slim design.
Slim Type-C 3.0 hub with 1xUSB 3.0 and 2xUSB 2.0 ports. Compact design with high-speed data transfer. Universal compatibility with various devices featuring Type-C ports.
Compact 5-in-1 Type-C hub with USB 3.0, USB 2.0, HDMI 4K, Ethernet (100Mb/s), and PD charging port. Simple and efficient connectivity solution for modern laptops and mobile devices.
Dual-input Type-C + USB A hub with 3xUSB 3.0 and Gigabit Ethernet (1000M). Features RTL8153 and VL815 chips, plug-and-play, bus-powered. No drivers needed for Windows 8/10/11 and Mac OS.
Dual-input 4-port USB 3.0 hub with Type-C and USB A 3.0 inputs. Data transfer up to 5Gbps, backward compatible with USB 2.0/1.1. Sleek aluminum casing with multi-protection circuit for device safety.
Dual-input Type-C & USB 3.0 hub with 1 USB 3.0 and 3 USB 2.0 ports. All-aluminum alloy body, plug-and-play, overload protection. Compatible with Windows and Mac systems. Fast data transfer up to 5Gbps.
Dual-input (Type-C & USB 3.0) Gigabit Ethernet network card. Supports 10/100/1000Mbps auto-negotiation, plug-and-play with built-in drivers. Compatible with multiple operating systems including Android.
7-in-1 Type-C hub with HDMI 2K/4K, USB 3.0, USB 2.0, LAN 100M, SD/TF card reader, and 55W PD charging. ABS+PC+aluminum alloy construction. Compatible with OS, Windows, and Linux systems.
Filter Products
Storage Size
200GB-400GB 2TB & Above 480GB-800GB 60GB-180GB
Brand
Dell(0) HP(0) Lenovo(0)
Brand x
Dell HP IBM Lenovo
Laptop Brand
Dell HP Lenovo Microsoft
Storage Type
HDD SSD
Screen Size
18.5 Inch to 20 Inch
Display Ports
HDMI - DP - VGA HDMI / DP & VGA VGA
Shape
Square Wide
Wattage
45W to 65W 85W to 100W
Connector Type
USB Type Pin USB Type-C
Generation
10th Gen 11th Gen 2nd Gen 3rd Gen 4th Gen 4th Generation 6th Gen 7th Gen 8th Gen 8th Generation 9th Gen
Storage Of Macbook
256GB SSD
Model Year
2017 - 2019
Processor
Intel Core i3 Intel Core i5 Intel Core i7
Graphics included
Integrated Graphics Card
Compatible Device
Desktop Laptop
RAM Capacity
Connectivity Technology
Product Required
Form Factor
2.5" SATA 3.5" SATA External M.2 AND NVME mSATA
Processor Type
Intel i3 Intel i5 Intel i7 Intel i9
Motherboard By Generation
10/11th Gen - i3/i5/i7/i9 12/13/14th Gen - i3/i5/i7/i9 Pentium IV / Dual Core / Core 2 Duo Pentium IV / Dual Core / Core 2 Duo
Motherboard RAM Type
DDR1 RAM Slot DDR2 RAM Slot DDR3 RAM Slot
Chipset
D425 D945 H610
Processor Socket Type
LGA 775
Filter by Desktop Processor
Intel Core i3 Intel Core i5 Intel Core i7
RAM (Memory)
16GB DDR3 For Desktop 16GB DDR3 RAM 16GB DDR3 RAM 16GB DDR4 16GB DDR4 16GB DDR4 16GB DDR4 For Desktop 16GB DDR4 RAM 16GB RAM 32GB DDR3 For Desktop 32GB DDR4 32GB DDR4 32GB DDR4 For Desktop 32GB DDR4 RAM 32GB RAM 4GB DDR3 For Desktop 4GB DDR3 RAM 4GB DDR4 RAM 64GB DDR4 For Desktop 64GB DDR4 RAM 8GB DDR3 For Desktop 8GB DDR3 RAM 8GB DDR3 RAM 8GB DDR4 8GB DDR4 8GB DDR4 8GB DDR4 For Desktop 8GB DDR4 RAM 8GB DDR4 RAM 8GB RAM
Storage
128GB DDR4 128GB SSD 128GB SSD 128GB SSD 128GB SSD Drive 1TB Harddisk 1TB Harddisk 1TB Harddisk Drive 1TB SSD 1TB SSD 1TB SSD 1TB SSD 1TB SSD Drive 256GB SSD 256GB SSD 256GB SSD 256GB SSD 256GB SSD Drive 2TB SSD Drive 2TB SSD Drive 2TB SSD Drive 500GB Harddisk 500GB Harddisk Drive 512GB SSD 512GB SSD 512GB SSD 512GB SSD 512GB SSD Drive
Memory RAM Type
DDR DDR2 DDR3 DDR3 DDR4
Brand
Gigabyte
Series
GT RTX 5000
Sort by
Products Sort by :
Search by Model No/Part No.
Price Slider
Price Range
INRMinimum Price - Maximum Price
Protected by
Shopping Cart
No products in the cart.
1
WhatsApp us

















