Laptop Power Cord

In Stock

Durable cable with 7mm outer diameter and pure copper connectors. Designed for fast charging and long-lasting performance. Robust construction withstands rigorous use.

  • Will be delivered within 3-5 working days.
  • Price Includes shipping costs for Retail Buyers.
  • Pick up at a VisionIT collection point is also possible.
  • Returns accepted within 7 days if unsatisfied.
  • Support available 10:00 AM – 7:00 PM.
SKU: GE_EVM_PCL01

Description

Specifications:
? OD 7mm
? Break load test
? 100% Pure Copper Connector
? Fast Charging
? Sturdy & Durable

Additional information

Brand

EVM

Product Type

USB Cable